Discussion:
CBU expiration and activate dynamic
(too old to reply)
Peter
2019-05-13 08:02:10 UTC
Permalink
Hi

We have activated CBU for our DR site and it remains for 10 days. Now This
is nearing for expiration.

Is it possible to activate another CBU token without IPLing the LPAR ? Is
there a way to activate CBU dynamically ?

Hardware : z14 zr1

Peter

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to ***@listserv.ua.edu with the message: INFO IBM-MAIN
Peter
2019-05-13 08:15:17 UTC
Permalink
Hi

Will there be any grace period before it expires?
Post by Peter
Hi
We have activated CBU for our DR site and it remains for 10 days. Now This
is nearing for expiration.
Is it possible to activate another CBU token without IPLing the LPAR ? Is
there a way to activate CBU dynamically ?
Hardware : z14 zr1
Peter
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to ***@listserv.ua.edu with the message: INFO IBM-MAIN
Parwez
2019-05-13 09:37:55 UTC
Permalink
Re grace period. I believe its 2 days.

However, my personal knowledge is a bit rusty now. Try this manual:

z Systems
Capacity on Demand User's Guide
SC28-6943-01

Regards

Parwez Hamid​

________________________________
From: IBM Mainframe Discussion List <IBM-***@LISTSERV.UA.EDU> on behalf of Peter <***@GMAIL.COM>
Sent: 13 May 2019 09:14
To: IBM-***@LISTSERV.UA.EDU
Subject: Re: CBU expiration and activate dynamic

Hi

Will there be any grace period before it expires?
Post by Peter
Hi
We have activated CBU for our DR site and it remains for 10 days. Now This
is nearing for expiration.
Is it possible to activate another CBU token without IPLing the LPAR ? Is
there a way to activate CBU dynamically ?
Hardware : z14 zr1
Peter
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to ***@listserv.ua.edu with the message: INFO IBM-MAIN

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to ***@listserv.ua.edu with the message: INFO IBM-MAIN
Peter
2019-05-13 10:00:50 UTC
Permalink
Parwez

I was going through the z14 Zr1 guide . I don't see about grace period for
CBU test Activation.

I am I missing something ?
Post by Parwez
Re grace period. I believe its 2 days.
z Systems
Capacity on Demand User's Guide
SC28-6943-01
Regards
Parwez Hamid​
________________________________
Sent: 13 May 2019 09:14
Subject: Re: CBU expiration and activate dynamic
Hi
Will there be any grace period before it expires?
Post by Peter
Hi
We have activated CBU for our DR site and it remains for 10 days. Now
This
Post by Peter
is nearing for expiration.
Is it possible to activate another CBU token without IPLing the LPAR ? Is
there a way to activate CBU dynamically ?
Hardware : z14 zr1
Peter
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to ***@listserv.ua.edu with the message: INFO IBM-MAIN
Parwez
2019-05-13 10:21:15 UTC
Permalink
Peter,

As I said, I am bit rusty on the actual T&Cs (over the years there have been some changes). The 2 days 'grace' period might related to CBU (for DR) rather than CBU Test. In both cases a warning is issued that that 'CBU' duration is going to expire. I myself don't have access to IBM's ResouceLink which should have the answers.

Regards

Parwez Hamid​

________________________________
From: IBM Mainframe Discussion List <IBM-***@LISTSERV.UA.EDU> on behalf of Peter <***@GMAIL.COM>
Sent: 13 May 2019 11:00
To: IBM-***@LISTSERV.UA.EDU
Subject: Re: CBU expiration and activate dynamic

Parwez

I was going through the z14 Zr1 guide . I don't see about grace period for
CBU test Activation.

I am I missing something ?
Post by Parwez
Re grace period. I believe its 2 days.
z Systems
Capacity on Demand User's Guide
SC28-6943-01
Regards
Parwez Hamid​
________________________________
Sent: 13 May 2019 09:14
Subject: Re: CBU expiration and activate dynamic
Hi
Will there be any grace period before it expires?
Post by Peter
Hi
We have activated CBU for our DR site and it remains for 10 days. Now
This
Post by Peter
is nearing for expiration.
Is it possible to activate another CBU token without IPLing the LPAR ? Is
there a way to activate CBU dynamically ?
Hardware : z14 zr1
Peter
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to ***@listserv.ua.edu with the message: INFO IBM-MAIN

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to ***@listserv.ua.edu with the message: INFO IBM-MAIN
Vielka-Lee Heitz
2019-05-13 14:02:27 UTC
Permalink
CBU test activation is 10 days max for each test.
A CBU REAL ACTIVATION (you are in a DR situation) would be up to 90 days.


-----Original Message-----
From: IBM Mainframe Discussion List [mailto:IBM-***@LISTSERV.UA.EDU] On Behalf Of Peter
Sent: Monday, May 13, 2019 5:01 AM
To: IBM-***@LISTSERV.UA.EDU
Subject: Re: CBU expiration and activate dynamic

Parwez

I was going through the z14 Zr1 guide . I don't see about grace period for CBU test Activation.

I am I missing something ?
Post by Parwez
Re grace period. I believe its 2 days.
z Systems
Capacity on Demand User's Guide
SC28-6943-01
Regards
Parwez Hamid​
________________________________
Sent: 13 May 2019 09:14
Subject: Re: CBU expiration and activate dynamic
Hi
Will there be any grace period before it expires?
Post by Peter
Hi
We have activated CBU for our DR site and it remains for 10 days. Now
This
Post by Peter
is nearing for expiration.
Is it possible to activate another CBU token without IPLing the LPAR
? Is there a way to activate CBU dynamically ?
Hardware : z14 zr1
Peter
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions, send
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions, send
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions, send email to ***@listserv.ua.edu with the message: INFO IBM-MAIN
This message (including any attachments) is intended only for the use of the individual or entity to which it is addressed and may contain information that is non-public, proprietary, privileged, confidential, and exempt from disclosure under applicable law or may constitute as attorney work product. If you are not the intended recipient, you are hereby notified that any use, dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, notify us immediately by telephone and (i) destroy this message if a facsimile or (ii) delete this message immediately if this is an electronic communication. Thank you.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to ***@listserv.ua.edu with the message: INFO IBM-MAIN
Peter
2019-05-14 16:30:02 UTC
Permalink
So to activate another test CBU. Does it require a POR ?

On Mon, 13 May, 2019, 6:02 PM Vielka-Lee Heitz, <
Post by Vielka-Lee Heitz
CBU test activation is 10 days max for each test.
A CBU REAL ACTIVATION (you are in a DR situation) would be up to 90 days.
-----Original Message-----
Sent: Monday, May 13, 2019 5:01 AM
Subject: Re: CBU expiration and activate dynamic
Parwez
I was going through the z14 Zr1 guide . I don't see about grace period for
CBU test Activation.
I am I missing something ?
Post by Parwez
Re grace period. I believe its 2 days.
z Systems
Capacity on Demand User's Guide
SC28-6943-01
Regards
Parwez Hamid​
________________________________
Sent: 13 May 2019 09:14
Subject: Re: CBU expiration and activate dynamic
Hi
Will there be any grace period before it expires?
Post by Peter
Hi
We have activated CBU for our DR site and it remains for 10 days. Now
This
Post by Peter
is nearing for expiration.
Is it possible to activate another CBU token without IPLing the LPAR
? Is there a way to activate CBU dynamically ?
Hardware : z14 zr1
Peter
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions, send
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions, send
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions, send email
This message (including any attachments) is intended only for the use of
the individual or entity to which it is addressed and may contain
information that is non-public, proprietary, privileged, confidential, and
exempt from disclosure under applicable law or may constitute as attorney
work product. If you are not the intended recipient, you are hereby
notified that any use, dissemination, distribution, or copying of this
communication is strictly prohibited. If you have received this
communication in error, notify us immediately by telephone and (i) destroy
this message if a facsimile or (ii) delete this message immediately if this
is an electronic communication. Thank you.
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to ***@listserv.ua.edu with the message: INFO IBM-MAIN
Peter
2019-05-16 04:04:14 UTC
Permalink
For the benefit of other members

Test CBU Activation gave me 10 days plus 2 days of grace period

Then I was able to activate another CBU without IPLing or POR

Thanks all and thanks especially to Parwez .
Post by Peter
So to activate another test CBU. Does it require a POR ?
On Mon, 13 May, 2019, 6:02 PM Vielka-Lee Heitz, <
Post by Vielka-Lee Heitz
CBU test activation is 10 days max for each test.
A CBU REAL ACTIVATION (you are in a DR situation) would be up to 90 days.
-----Original Message-----
Sent: Monday, May 13, 2019 5:01 AM
Subject: Re: CBU expiration and activate dynamic
Parwez
I was going through the z14 Zr1 guide . I don't see about grace period
for CBU test Activation.
I am I missing something ?
Post by Parwez
Re grace period. I believe its 2 days.
z Systems
Capacity on Demand User's Guide
SC28-6943-01
Regards
Parwez Hamid​
________________________________
Sent: 13 May 2019 09:14
Subject: Re: CBU expiration and activate dynamic
Hi
Will there be any grace period before it expires?
Post by Peter
Hi
We have activated CBU for our DR site and it remains for 10 days. Now
This
Post by Peter
is nearing for expiration.
Is it possible to activate another CBU token without IPLing the LPAR
? Is there a way to activate CBU dynamically ?
Hardware : z14 zr1
Peter
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions, send
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions, send
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions, send
This message (including any attachments) is intended only for the use of
the individual or entity to which it is addressed and may contain
information that is non-public, proprietary, privileged, confidential, and
exempt from disclosure under applicable law or may constitute as attorney
work product. If you are not the intended recipient, you are hereby
notified that any use, dissemination, distribution, or copying of this
communication is strictly prohibited. If you have received this
communication in error, notify us immediately by telephone and (i) destroy
this message if a facsimile or (ii) delete this message immediately if this
is an electronic communication. Thank you.
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to ***@listserv.ua.edu with the message: INFO IBM-MAIN
Horst Sinram
2019-05-13 11:19:39 UTC
Permalink
Multiple CBU records may be active at the same time. CBU resources can be activated, deactivated, or the activation level changed concurrently (from an LPAR perspective).
I assume you're using shared processors only and z/OS. Usually, from z/OS you may need to configure additional logical processors online to utilize more logicals from a given LPAR, or (recommended) configure logicals offline before physically deactivating resources, if the new number of physical processors in the shared processor pool would be less than the number of logicals online to any single partition.
You cannot extend the CBU resources *from a given record* beyond the grace period. The Capacity on Demand user's Guide for your hardware model is a good resource, e.g., regarding the grace period handling.
In general, there should be no reason for IPLing z/OS unless you had disabled DYNCPADD in your LOADxx, or you would be running out of the limit and you need to utilize more logical processors. z/OS subsystems are usually well prepared to deal with model changes.

Horst Sinram - STSM, z/OS Workload and Capacity Management

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to ***@listserv.ua.edu with the message: INFO IBM-MAIN
Loading...